Topic: Project manage the design and construction of an electrical power station for a community of 20,000 residents.
Content
Introduction
Subject of the essay arranged under sub-headings
involves definition & description; data & analysis;
illustrations (images, charts & diagrams); and
specialised language
Conclusion
References
This project report is on the project appraisal incorporating technical, economical and environmental evaluation of
Project manage the design and construction of an electrical power station for a community of 20,000 residents.
Technical (40%)
Economical (30%)
Environmental (30%)
Research Publication (Written)
Title page, Abstract and Contents
complete and representative title
concise abstract (what?, why?, how?,
findings)
comprehensive contents page
Introduction
problem identification
need for the research, including critical
analysis of available literature
clearly stated objective and aims
a summary on report organisation Research Publication (Written) contd.
Research Method
clearly presented methods for repeatability
assumptions and limitations
analysis techniques clearly described/identified
Results
tables, figures, photographs and illustrations to
enhance findings
clearly argued findings
identify potential for future directions
References
cite all references used in the report using Harvard
(name-year) style
resources
Smith, K. A.. and Imbrie, P. K. 2007, Teamwork and Project Management, 3rd ed., Mc-Graw Hill, NY, USA
Finkelstein, L, 2008 Pocket Book of Technical Writing: for Engineers and Scientists, 3rd ed., Mc-Graw Hill, NY, USA.
Readings: (ALL texts have been placed on 2-hour RESERVE at Allen
Library)
Burke, R., 2003, Project Management: Planning and Control Techniques, 4th ed., John Wiley & Sons, New York, USA.
CCH Editors. 2007. CCH Australian Master OHS and Environmental Guide. 2nd ed. CCH Australia Limited.
De Cieri, H., Kramar, R., Noe, R. A., Hollenbeck, J. R., Gerhart, B. And Wright, P. M. 2008, Human Resource Management in
Australia. 3rd ed., McGraw-Hill Australia Pty Ltd.
Duncan, W. R. 1996. A Guide to Project Management Body of Knowledge. PMI Publishing Division, North Carolina, USA.
Grammeno, G. 2009. Planning Occupational Health and Safety. 8th ed. CCH Australia Limited.
Finkelstein, L, 2008 Pocket Book of Technical Writing: for Engineers and Scientists, 3rd ed., Mc-Graw Hill, NY, USA.
Johnson, L., 1994, Project Management, video recording, CareerTrack Publications, Boulder, CO, USA. (four volumes)
Michaels, J. V., 1996, Technical risk management, Prentice Hall, NJ, USA
PMI, 2008, A Guide to the Project Management Body of Knowledge, 4th ed., PMI Publishing Division, North Carolina, USA.
Quinlan & Bohle, L. 2010. Managing OH and S. Pan Macmillan, Australia.
Standards Australia 1997, General Conditions of Contract, AS4000
(AS2124) Retrieved June 25, 2007, from Standards Australia Online
database. Standards Australia 1997, General Conditions of Contract, AS4000-1997. (AS2124) Available from Standards
Australia Online.
Standards Australia 2002, Minor Works Contract Conditions (Superintendent administered). AS4905-2002, Retrieved June 25,
2007, from Standards Australia Online database.
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.