Managing Hard Rocks Rock Fest Case study Read the case and watch the case video carefully at first, and write-up case study notes, it needs 1page and includes the information below(may need 3 paragraphs). Notes should cover the following three key points (at a minimum).
1. State the mission of the company discussed in the case
2. Identify a key operational challenge at the company
3. Make a high-level strategic recommendation to address that challenge
Watch the case video for more info:
https://mediaplayer.pearsoncmg.com/assets/_embed.t… TABLE 3.7
Expansion Planning and Arnold Palmer Hospital Construction Activities and Timesa
ACTIVITY
SCHEDULED TIME
PRECEDENCE ACTIVITY(IES)
1 month
2 weeks
1
5 weeks
1
1 month
1
6 weeks
3
2 months
2, 4,5
1 month
6
1. Proposal and review
2. Establish master schedule
3. Architect selection process
4. Survey whole campus and its needs
5. Conceptual architect’s plans
6. Cost estimating
7. Deliver plans to board for consideration/decision
8. Surveys/regulatory review
9. Construction manager selection
10. State review of need for more hospital beds (“Certificate of Need”)
11. Design drawings
12. Construction documents
13. Site preparation/demolish existing building
14. Construction start/building pad
6 weeks
6
9 weeks
6
3.5 months
7,8
4 months
10
5 months
9, 11
9 weeks
11
2 months
12, 13
15. Relocate utilities
6 weeks
12
2 months
14
16. Deep foundations
17. Building structure in place
18. Exterior skin/roofing
9 months
16
4 months
17
19. Interior buildout
12 months
17
5 weeks
15, 19
20. Building inspections
21. Occupancy
1 month
20
aThis list of activities is abbreviated for purposes of this case study. For simplification, assume each week = 25 months (i.e., 2 weeks = 5 month,
6 weeks = 1.5 months, etc.).
for the new facility. An administrative team created 35 user
groups, which held over 1,000 planning meetings (lasting from 45
minutes to a whole day). They even created a Supreme Court
to deal with conflicting views on the multifaceted issues facing the
new hospital.
Funding and regulatory issues added substantial complexity
to this major expansion, and Hodges was very concerned that the
project stay on time and within budget. Tom Hyatt, director of
facility development, was given the task of onsite manager of the
$100 million project, in addition to overseeing ongoing renova-
tions, expansions, and other projects. The activities in the multi-
year project for the new building at Arnold Palmer are shown in
Table 3.7.
Discussion Questions*
1. Develop the network for planning and construction of the new
hospital at Arnold Palmer,
2. What is the critical path, and how long is the project expected
to take?
3. Why is the construction of this 11-story building any more
complex than construction of an equivalent office building?
4. What percent of the whole project duration was spent in plan-
ning that occurred prior to the proposal and reviews? Prior to
the actual building construction? Why?
*You may wish to view the video accompanying this case before address-
ing these questions.
Managing Hard Rock’s Rockfest
Video Case ©
At the Hard Rock Cafe, like many organizations, project manage-
ment is a key planning tool. With Hard Rock’s constant growth in
hotels and cafes, remodeling of existing cafes, scheduling for Hard
Rock Live concert and event venues, and planning the annual
Rockfest, managers rely on project management techniques and
software to maintain schedule and budget performance.
Without Microsoft Project,” says Hard Rock Vice-President
Chris Tomasso, “there is no way to keep so many people on the
same page. Tomasso is in charge of the Rockfest event, which
is attended by well over 100,000 enthusiastic fans. The chal-
lenge is pulling it off within a tight 9-month planning horizon.
As the event approaches, Tomasso devotes greater energy to its
activities. For the first 3 months, Tomasso updates his Microsoft
Project charts monthly. Then at the 6-month mark, he updates his
progress weekly. At the 9-month mark, he checks and corrects his
schedule twice a week.
Early in the project management process, Tomasso iden-
tifies 10 major tasks (called level-2 activities in a work
breakdown structure, or WBS): talent booking, ticketing,
marketing/PR, online promotion, television, show production,
travel, sponsorships, operations, and merchandising. Using a
WBS, each of these is further divided into a series of subtasks.
Table 3.8 identifies 26 of the major activities and subactivities,
their immediate predecessors, and time estimates. Tomasso
enters all these into the Microsoft Project software. * Tomasso
alters the Microsoft Project document and the time line as the
project progresses. It’s okay to change it as long as you keep
on track,” he states.
The day of the rock concert itself is not the end of the project
planning. It’s nothing but surprises. A band not being able to get
to the venue because of traffic jams is a surprise, but an ‘antici-
pated’ surprise. We had a helicopter on stand-by ready to fly the
band in, says Tomasso.
On completion of Rockfest in July, Tomasso and his team
have a 3-month reprieve before starting the project planning pro-
cess again.
*The level-1 activity is the Rockfest concert itself.
*There are actually 127 activities used by Tomasso; the list is abbreviated
for this case study.
Ek
TABLE 3.8
Some of the Major Activities and Subactivities in the Rockfest Plan
ACTIVITY DESCRIPTION
PREDECESSOR(S)
TIME (WEEKS)
A
Finalize site and building contracts
7
B
Select local promoter
A
3
? C
Hire production manager
A
3
c
D
Design promotional Web site
B
5
E
Set TV deal
D
6
F
Hire director
E
4.
O
G
Plan for TV camera placement
F
2
H
Target headline entertainers
B
4
1
Target support entertainers
H
4
J
Travel accommodations for talent
1
10
K
Set venue capacity
? C
2
L
Ticketmaster contract
D, K
3
M
On-site ticketing
L
8
N
Sound and staging
C
6
O
Passes and stage credentials
GR
7
?
Travel accommodations for staff
20
Q.
Hire sponsor coordinator
B
4
R
Finalize sponsors
Q
4.
S
Define/place signage for sponsors
R, X
3
T
Hire operations manager
A
4.
U
Develop site plan
6
EE
V
Hire security director
7
W
Set police/fire security plan
V
4
?
Power, plumbing, AC, toilet services
U
8
Y
Secure merchandise deals
B
6
Z
Online merchandise sales
Y
6
TU2
LIVILI
PARI
INIRUDULTIUI TU
TOIVU IVI IV
4. Why is a work breakdown structure useful in a project such as
this? Take the 26 activities and break them into what you think
should be level-2, level-3, and level-4 tasks.
esc
Discussion Questions
1. Identify the critical path and its activities for Rockfest. How
long does the project take?
2. Which activities have a slack time of 8 weeks or more?
3. Identify five major challenges a project manager faces in events
such as this one.
$You may wish to view the video accompanying this case before addressing
these questions.
Additional Case Study: Visit MyOMLab for this free case study:
Shale Oil Company: This oil refinery must shut down for maintenance of a major piece of equipment.
tab
Endnotes
caps lock
2. Source: Adapted from James A. D. Stoner, Management, 6th
ed. (Upper Saddle River, NJ: Pearson).
1. This formula is based on the statistical concept that from one
end of the beta distribution to the other is 6 standard devia-
tions (3 standard deviations from the mean). Because (b – a)
is 6 standard deviations, the variance is [(b ? a)/6]?.
shift
fn
??
Purchase answer to see full
attachment
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.