if a community hospital invested 10 000 in excess cash today what would be the value 613231

The Intangible Asset Model – recording the construction asset

Arrangement terms

Don't use plagiarized sources. Get Your Custom Essay on
if a community hospital invested 10 000 in excess cash today what would be the value 613231
Get an essay WRITTEN FOR YOU, Plagiarism free, and by an EXPERT! Just from $10/Page
Order Essay

The terms of a service arrangement require an operator to construct a road – completing construction within two years – and maintain and operate the road to a specified standard for eight years (i.e. years 3-10). The terms of the arrangement also require the operator to resurface the road when the original surface has deteriorated below a specified condition. The operator estimates that it will have to undertake the resurfacing at the end of the year 8. At the end of year 10, the service arrangement will end. The operator estimates that the costs it will incur to fulfil its obligations will be:

Table 1 Contract costs

Year

Construction services (per year)

1-2

500

Operation services (per year)

3-10

10

Road resurfacing

8

100

The terms of the arrangement allow the operator to collect tolls from drivers using the road. The operator forecasts that vehicle numbers will remain constant over the duration of the contract and that it will receive tolls of €200 in each of years 3-10.

For the purpose of this illustration, it is assumed that all cash flows take place at the end of the year.

Intangible asset

The operator provides construction services to the grantor in exchange for an intangible asset, i.e. a right to collect tolls from road users in years 3-10. In accordance with IAS 38, the operator recognises the intangible asset at cost, i.e. the fair value of consideration received or receivable.

During the construction phase of the arrangement the operator’s asset (representing its accumulating right to be paid for providing construction services) is classified as an intangible asset (licence to charge users of the infrastructure). The operator estimates the fair value of its consideration received to be equal to the forecast construction costs plus 5 per cent margin. It is also assumed that the operator adopts the allowed alternative treatment in IAS 23 and therefore capitalises the borrowing costs, estimated at 6.7 per cent, during the construction phase:

Table 2 Initial measurement of intangible asset

ε

Construction services in year 1 (€500 X (1 + 5%))

525

Capitalisation of borrowing costs

34

Construction services in year 2 (€500 X (1 + 5%))

525

Intangible asset at end of year 2

1,084

The intangible asset is amortised over the period in which it is expected to be available for use by the operator, i.e. years 3-10. In this case, the directors determine that it is appropriate to amortise using a straight-line method. The annual amortisation charge is therefore €1,084 divided by 8 years, i.e. €135 per year.

Construction costs and revenue

The operator recognises the revenue and costs in accordance with IAS 11 i.e. by reference to the stage of completion of the construction. It measures contract revenue at the fair value of the consideration received or receivable. Thus in each of years 1 and 2 it recognises in its income statement construction costs of €500, construction revenue of €525 (cost plus 5 per cent) and, hence, construction profit of €25.

Toll revenue

The road users pay for the public services at the same time as they receive them, i.e. when they use the road. The operator therefore recognises toll revenue when it collects the tolls.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.