Effect of an incentive scheme on company profits. You have been approached for your advice on the proposed introduction of an incentive scheme for the direct operatives in the final production department of a factory producing one standard product. This department the Finishing Shop. employs 30 direct operatives. all of whom are paid £8 per hour for a basic 410-hour week. with a guaranteed wage 01(3)3 per week. When necessary. overtime is worked up to a maximum of 15 hours per week per operative and is paid at time rate plus one-half. It is the opinion of the personnel manager that no more direct operatives could be recruited for this department.
An analysis of recent production returns from the Finishing Shop indicates that the current average output is approximately to units oldie standard product per productive man-hour. The work study manager has conducted an appraisal of the working methods in the Finishing Shop and suggests that it would be reasonable to expect operatives to process S units of the product per man-hour and that a piecework scheme he introduced in which the direct operatives arc paid 11.40 for each unit processed. It is anticipated that. when necessary. Operatives would continue to work overtime up to the previous specified limit, although as the operatives would be on piece work no premium would be paid. Next year”s budgeted production for the factory varies from a minimum of 7000 units per week to a maximum of 12000 units per week with the most frequent budgeted weekly output being 9600 units-The expected selling price of the product next year is £11 per unit and the budgeted variable production cost of the incomplete product passed into the Finishing Shop amounts to £8 per unit. Variable production overheads in the Finishing Shop. excluding the overtime premium of the direct operatives, are budgeted to be £0.48 per direct labour hour worked. and it is considered that variable overheads130mile directly with productive hours worked. Direct material costs are not incurred by the Finishing Shop. The fixed overheads incurred by the factory amount in total to D9000 per week. Stocks of work in progress and finished goods are not carried.
Required:
(i) Calculate the effect on the company”s budgeted weekly profits of the proposed incentive scheme in the Finishing Shop. (Calculation should be to the nearest 1.)
(ii) Explain the reasons for the changes in the weekly budgeted profits caused by the proposed incentive scheme.
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.