HCS446 Week 5 Facility Planning Floor Plan Part 3 Assignment Week Five: Facility PlanningFloor Plan, Part 3
This week you will complete your floor plan by incorporating additional elements, such as IT equipment and creative healing elements. It is important to review your facility and consider any additional changes based on the knowledge you have gained throughout the course.
Other elements:
IT equipment
Creative healing environment ideas
Describe technology, equipment, and design elements you would use to support the sustainability of your facility in the future.
Explain how designing a community-based sustainable health care facility will address the needs of the community demographics of your facility.
Imagine this facility was a renovation of an existing structure and describe what you would have done differently while planning your facility.
Describe successes and challenges during your facility design.
Describe successes experienced while designing your facility.
Describe challenges experienced while designing your facility.
Describe what you would do differently to address your challenges.
Write a 350- to 700-word response to the following:
Cite at least 2 peer-reviewed, scholarly, or similar references.
Format your assignment according to APA guidelines.
Submit your facility planning template and completed floorplan.
NB : Please find attached floor plan in its first stage for your review and may be used added to complete the floor plan at this time. But if if you wish to make a new one please do. This plan was was created using the The Microsoft word.
Facility chosen is : Birthing center Running head: FACILITY PLANNING
FACILITY PLANNING- Floor Plan
Omobola Jawo
HCS/446
Professor: Jenifer Huff
April 15, 2019
FACILITY PLANNING
Facility Planning
1
2
3
8
4
5
55
7
6
KEY.
1. Administrative offices 2. Reception desk 3. The patients waiting area 4. Bathroom,
shower and vending machine 5. Diagnostic and treatment space Patient’s 6. Consultation
area 7. Mechanical equipment area. 8. Hallways
Response.
Coming up with this structure constituted a lot of engagement in terms of drawing.
Mainly, the Microsoft word shapes have been of great help in coming up with the structure.
Some of the shapes that were mainly utilized include straight lines, squares, and rectangles. With
the help of these shapes, it was easier to come up with and decorate the various constituents of
FACILITY PLANNING
the structure. The key success enjoyed in this weeks drawing is that all the requirements in the
structure were well incorporated in the structure. Also, the shapes were incorporated into the
structure in the right way. Consequently, this made the structure to look organized, attractive and
appealing to the eyes. Needless to mention, assembling and adjusting shapes in the Microsoft
word was not an easy task. It requires a lot of concentration and time as well to produce a perfect
structure (Stinnett & Gibson, 2016). Additionally, the color was not greatly utilized in coming up
with this facility because it entails a lot. Without keenness, one may end up spoiling the whole
structure hence forced to start all over again which is not easy.
FACILITY PLANNING
References
Stinnett, B., & Gibson, F. (2016). Sustainable facility development: perceived benefits and
challenges. International Journal of Sustainability in Higher Education, 17(5), 601-612.
Running head: FACILITY PLANNING
FACILITY PLANNING- Floor Plan
Facility Planning
1
2
3
FACILITY PLANNING
8
4
5
55
7
6
KEY.
1. Administrative offices 2. Reception desk 3. The patients waiting area 4. Bathroom,
shower and vending machine 5. Diagnostic and treatment space Patient’s 6. Consultation
area 7. Mechanical equipment area. 8. Hallways
Response.
Coming up with this structure constituted a lot of engagement in terms of drawing.
Mainly, the Microsoft word shapes have been of great help in coming up with the structure.
Some of the shapes that were mainly utilized include straight lines, squares, and rectangles. With
the help of these shapes, it was easier to come up with and decorate the various constituents of
the structure. The key success enjoyed in this weeks drawing is that all the requirements in the
structure were well incorporated in the structure. Also, the shapes were incorporated into the
structure in the right way. Consequently, this made the structure to look organized, attractive and
appealing to the eyes. Needless to mention, assembling and adjusting shapes in the Microsoft
word was not an easy task. It requires a lot of concentration and time as well to produce a perfect
structure (Stinnett & Gibson, 2016). Additionally, the color was not greatly utilized in coming up
FACILITY PLANNING
with this facility because it entails a lot. Without keenness, one may end up spoiling the whole
structure hence forced to start all over again which is not easy.
References
Stinnett, B., & Gibson, F. (2016). Sustainable facility development: perceived benefits and
challenges. International Journal of Sustainability in Higher Education, 17(5), 601-612.
FACILITY PLANNING
Purchase answer to see full
attachment
part one For this assignment you are to to watch: Shattered Glass Write a two…
Standard Project - WebServers. Instruction attached. Need all requirements, you do not have to make…
Read classmates post and respond with 100 words:The International Categorization of Diseases, Tenth Revision, Clinical…
Most Americans have at least 1 issue that is most important to them. Economic issues…
For this assignment, you are the court intake processor at a federal court where you…
Use a standard outline format to lay out how you are going to write your…